Existing floor plans, elevations and sections drawn from a laser scan. A clean base for your renovation or permit set.

Tell us the address and what the drawings are for. We reply with a scope, a price and a date.
Renovation checklists often ask for the existing layout. The City of North Vancouver's checklist for house renovations asks for an existing and demolition floor plan of the entire house.
For multi-unit renovations in Vancouver, a key plan is needed when work is only in part of the building. We can draw the whole floor so the key plan is easy.
Usually 3 to 5 business days after the scan for a house or unit.
Old houses with no plans before a renovation or suite.
Building records for repairs and upgrades.
A measured base so you can start designing.
Send the address and the deliverables you need. We will scope and quote it.